Installation · From Signature to Startup

Order the power. Skip the project.

From the moment you accept the quote, the permits, the equipment, the trades, and the inspections are ours to carry. You get updates — not homework — and a generator that’s running before the yard even knows what happened.

Permits pulled for youAbout two days on siteComplete cleanup, debris and all

In Writing, on Every Quote

What “included” actually includes.

One lump-sum price covers the generator and everything it takes to make it yours. These four lines appear on our quotes because they’re the four things people get burned on elsewhere.

01

Permit acquisition

We register with your municipality, prepare the application package, and pull the permit. Your town’s rules become our problem.

02

Equipment, ordered & delivered

Your deposit puts the exact unit on order. We track it, receive it, and get it to your address — no freight mysteries.

03

Installation, testing & startup

Placement, gas and electrical connections, the transfer switch, then a full startup and load test before anyone calls it done.

04

Complete site cleanup

All materials and debris leave when we do. The only evidence of the project is the quiet machine beside the house.

Permit and plan-review fees vary by municipality and are quoted with your job — shown up front, never discovered later.

Six Stages, One Variable

Signature to startup, stage by stage.

Every install moves through the same six stages. Five of them run on our clock. One runs on your town’s — and we’ll tell you which honestly instead of promising a date we don’t control.

01The conversationYour home, your panel, your fuel source, and what has to stay on. A short call gets us most of the way; a site walk settles the rest.
02The quoteOne lump-sum number for the generator, the install, and the startup — with a straight recommendation on size, not an upsell.
03Financing, if you want itFinancing is available through Synchrony. Take it or skip it — card and check work too. Your 50% deposit puts the equipment on order either way.
04Permits The variableEvery municipality has its own checklist, timeline, and fees — this is the one stage whose length your town decides, not us. We prepare the package, file it, and keep you posted while the calendar does its thing.
05InstallMost installs average about two days on site. Larger liquid-cooled units add roughly a day — pouring the pad is a job of its own.
06Startup & load testThe system runs under real load while you watch, the transfer switch does its handoff, and you get a walkthrough of your new normal. Then we clean up and disappear.
The Short Disruption

Two days. Then it’s just there.

An install is a brief, organized visit — not a season of contractors. Here’s the honest picture of what your yard signs up for.

Air-cooled units can sit as close as 18 inches from the house — the footprint is about the size of a deep freezer

Gas and electrical runs are trenched, connected, and inspected to code

Larger liquid-cooled units get an engineered concrete pad — poured and cured before the unit arrives

Licensed electricians and gas fitters do their trades; GPM manages the job and stays your single point of contact

When we leave, the debris leaves with us — cleanup is written into every quote

A Cummins QuietConnect liquid-cooled standby generator

Liquid-cooled 25–150 kW units add about a day — the poured pad comes first

The Permit PackagePrepared & filed by GPM · contents vary by municipalityDimensional site plan — distances to openings, property lines & A/C unitsElectrical plans with load calculations & riser diagramsSlab specification — pre-cast, or engineered if pouredGas piping diagram — size, material & length (or LP tank location)Carbon monoxide detector placementEmergency shutdown switch, marked for the fire departmentManufacturer specifications & installation instructionsFiled with your municipality · review fees quoted with the job
Why This Doesn’t Get Skipped

The paperwork you’ll never have to learn.

A generator permit isn’t a form — it’s an engineering package, and every town wants it their way. GPM registers as a contractor with each municipality we work in and files the whole package for your job. You’ll hear about it exactly once: when it’s approved.

Requirements differ from Crystal Lake to Fort Myers — we quote and file to your town’s checklist, not a generic one

Florida homeowners: jobs like this require a Notice of Commencement with your signature — we’ll walk you through it before it’s due, not after

Propane and fuel-tank work can carry its own fire-department permit — if your job needs one, it’s in the plan from day one

Inspections are scheduled and attended by us, at every required stage

No Fine-Print Finance

Paying for it, in plain terms.

To begin50% down

Your deposit on acceptance is what orders the equipment — your exact unit goes on the books that day.

To finishBalance at completion

The rest is due at completion — after startup, the load test, and your own walkthrough say it’s done right.

On your work1-year workmanship

Our installation workmanship is backed for a year — layered on top of the Cummins factory warranty on the equipment itself.

One lump-sum price covers the generator, installation, and startup; maintenance plans and accessories are itemized separately so you can see exactly what’s optional. Financing is available through Synchrony. Apply through your GPM location:

~2daysThe average install, start to cleanup, on site
18inHow close an air-cooled unit can sit to your home
6stagesSignature to startup — five on our clock, one on your town’s
0debrisWhat’s left in your yard when the job is done
Straight Answers

Asked at every kitchen table.

Who actually does the work?

Licensed trade professionals — electricians for the electrical, gas fitters for the gas — working under GPM’s management. That’s the standard structure for this work; municipalities build their permit process around it, right down to the subcontractor worksheets. What you get from GPM is one accountable point of contact from quote to startup, so you never referee between trades.

How long from signing to a running generator?

The install itself averages about two days on site. The calendar around it is set mostly by permitting, which varies town to town — some approve in days, some take longer. We’ll give you the realistic picture for your municipality with your quote, and we’d rather tell you the honest number than a flattering one.

What’s a Notice of Commencement, and why do I sign it?

In Florida, state law requires a recorded, notarized Notice of Commencement for home-improvement work above a modest threshold — and a generator install clears it. It’s signed by you as the property owner. It’s routine, but it surprises people mid-project when nobody warned them — so we handle the preparation and tell you exactly when and where your signature is needed, before it’s due.

Does my gas line or meter need an upgrade?

Sometimes — a standby generator is a serious gas appliance, and some homes need a meter or line upsized to feed it. The load calculation in your quote tells us early, and if the utility needs to be involved, we coordinate that work rather than leaving you to call them yourself.

What will my yard look like afterward?

Like your yard — plus one quiet machine. Trench lines for gas and electrical are backfilled, packaging and offcuts leave in our truck, and complete site cleanup is written into every quote as part of the job, not a courtesy. The generator sits on its pad as close as 18 inches from the house, minding its own business.

Don't wait for the lights to flicker

Be ready before the next outage.

Get a free, no-pressure quote from your local Cummins dealer.

Prefer to talk? Call (630) 532-6186